Optibus GTT
A graphical timetable for rail planners that marks each conflict where it happens and previews every fix.
- Client
- Optibus
- Role
- Product Design Consultant
- Years
- 2025-now
- Platforms
- Desktop web app, working prototype
- Scope
- Product design, interactive prototype, handover documentation

The situation
Optibus makes planning and scheduling software for public transport. The graphical timetable (GTT) is the chart where planners build and check a service: stations down the side, time across the top, one line per trip. For the Optibus Rail project I prototyped a new GTT and, in October 2026, wrote the documentation that handed it over to the Optibus team.
A rail timetable fails in ways a list can’t show well. Two trains cross a junction 5 seconds apart when the rule asks for a minute. A gap opens in the morning peak. A layover at the hub is too short to turn the train. In the current Optibus GTT these violations don’t appear on the chart. They are listed in a separate validation window and flagged in a vehicle view, with no suggested fixes. An internal workshop and interviews with clients pointed to validation on the chart as the feature most likely to change how planners work, so it was built first.
The prototype runs on a full plan: Winter 2026 for the Blue Line from Albolote to Armilla, with 12 timepoints, 19 stops, 236 trips and 39 vehicle blocks. Most of it doesn’t depend on rail. The handover maps every feature to bus, where the rule set, the depot language and the time precision change and the screens stay.
The system behind it
- Data
- Trips timed to the second, four patterns from 9 to 19 stops, stations typed as hubs, timepoints, stops and junctions, depot and workshop rows, and vehicle blocks that chain trips into one vehicle’s day.
- Rules
- Twelve rules in use on this plan, among them headway adherence, dwell time, running time against observed, layover and recovery, junction separation, and a timed transfer at Estación Ferrocarril. Each rule has values per timeplan, line and direction.
- People
- Rail planners who build the timetable, and the scheduling team that owns the vehicle blocks.
Decisions
Each conflict sits where it happens
What brokeA planner reads “junction separation” in a validation window, then has to find the two trains on the chart before fixing anything.
What I decidedEvery issue is drawn at its station and minute, a red dot for an error and an amber diamond for a warning. Hovering one names the rule, the two trips and the gap: 0:05 against a required 1:00. Clicking it selects the trip and opens the Validation panel on that issue. A strip under the chart shows every issue across the day.
The trade-offA whole day is 118 outbound trips and 20 issues on one chart. Overlapping issues collapse into a count, and the Issues layer can be switched off, which hides the problems along with the noise.

Hover names the rule, the trips and how far off the plan is, without leaving the chart. Every fix is previewed before it lands
What brokeKnowing a rule is broken doesn’t say how to repair it, or what the repair breaks elsewhere. In a dense plan, moving one train by a minute can push it into the next conflict.
What I decidedThe panel says why the rule fired and how far short the plan is, then ranks fixes, with the best flagged. Preview draws the trip before and after on the chart and counts issues introduced, resolved and unchanged across the whole plan: 20 down to 19, no vehicle change. Apply comes with Undo. A fix that would reduce a network-locked safety value is listed and locked.
The trade-offPreview is an extra step, and the callout’s one-click Apply skips it. Comparing two fixes side by side was left out of the prototype.

Before and after on the chart, the count for the whole plan in the panel. Nothing changes until Apply. Rules set per timeplan, line and direction
What brokeA headway target that suits the morning peak is wrong at 23:00, and one value per rule would raise the same warnings every evening.
What I decidedThe Rules dialog edits each rule at three levels: the timeplan, the line and the direction. Every value says whether it is set here or inherited. Under the rules, the coupled KPIs (PVR, layover and recovery, headway adherence) keep the plan’s numbers in view while targets change.
The trade-offWith three levels, a value can come from a level the planner isn’t looking at. The source label on each row is the only guard.

Each target shows whether it was set here or inherited. The KPIs it affects sit under the list. Trips built in the chart, counted before they exist
What brokeThe current GTT can’t create trips in the chart. Generating trips by headway happens only in the timetable table.
What I decidedThe create tool adds a single trip or a deadhead, places a trip on the canvas, or generates trips by headway. The headway dialog takes direction, pattern, first and last departure and a headway, then shows the result on a timeline before anything is created: 103 trips every 10 minutes from 06:00 to 23:00.
The trade-offGenerated trips take default running times, so a new block still has to be checked against the running-time rule afterwards.

The count and spread of trips are visible before they exist. A vehicle’s whole day on the timetable
What brokeIn the current product, vehicles live in a separate Gantt-style view, away from the chart where their trips are planned.
What I decidedThe Blocks panel lists all 39 blocks with depot, span and trip count, plus the peak vehicle requirement of 18. Selecting a block switches the chart to both directions and traces the vehicle through its day, with duty time, layover and deadhead. Every trip card links to its block.
The trade-offBlocks belong to the scheduling module, so disconnecting and editing chains from the timetable has to respect that ownership.

One vehicle’s day traced across both directions: 15 trips, 13 hours on duty, a quarter of it in layover.
After the handover
As far as I know, the Optibus team is building the most usable parts into the graphical timetable on the main Optibus platform, rather than into a separate light-rail product. The handover had already mapped every feature to bus.
My part
I have worked with Optibus as a Product Design Consultant since 2025, through TN Tech. On the GTT I built the prototype and wrote the handover documentation.
The prototype switches between two versions: V0, the MVP with the chart on its own, and V2, the design the work aimed for, which every screen here shows.
More screens

The whole workspace on one screen: filters above, tools on the left, the day’s density and issues below. 
FIT shows the whole day. The window on the density strip sets what the chart shows. 
Six plan KPIs above the chart, one toggle away. 
Times to the second, where the current GTT works in minutes. 
Drag across the chart to read span, trips and average headway. 
12 timepoints or all 19 stops. Junctions are track nodes with no passenger service. 
To scale, each line’s slope shows true speed. Close stops crowd their labels. Schematic is the default. 
V0, the MVP: the chart on its own. Every other screen here is V2, the design the work aimed for.